The part is announced. What can a buyer do today?
Texas Instruments introduced the ADC34DSO75 at the OCP Global Summit on October 12, 2026. It is a four-channel, 14-bit ADC rated up to 3 GSPS, with event detection and capture. The manufacturer page displayed Preview when we reviewed it. That is enough to open an engineering watch. It is not a confirmed quantity or delivery date for a production build.
The product page also links to the ADC34RF72EVM. TI's description says that board is populated with an ADC34RF72. Keep the board in a separate row. The link is a useful development lead; it does not demonstrate that the ADC34DSO75 is mounted on that board or that the EVM validates the new device for your design.
Give each signal a place to land
| Record | What we observed | Next evidence |
|---|---|---|
| ADC34DSO75 device | Product page and dated data sheet | Exact orderable suffix and packaging for the intended design |
| Development hardware | Linked ADC34RF72 evaluation board | Board manual or supplier confirmation for the proposed test |
| Production availability | No order commitment established by the announcement | Quantity and ship date against a specific order line |
For a concrete project, suppose validation needs five devices and the first build needs 100. Ask for sample timing and a production quote separately. A shipment of five samples may unblock the lab while all 100 build units remain uncovered. Do not let the sample receipt close the build risk.
Define the alerts a buyer would act on
First, notify the design owner when a new data-sheet revision changes an input used in the schematic or footprint. Next, notify purchasing when the manufacturer or an authorized channel exposes an exact orderable suffix matching the approved variant. Count a production quantity only when the supplier gives the needed order-specific evidence. This sequence avoids prompting a buyer every time a preview page changes copy.
Who this is for
Use this as a preview-stage sourcing example. Product status can change; check the TI product page and supplier response before committing. The TI monitoring guide explains which supply signals to keep separate once an exact ordering number is available.